Missy Hermes made a motion to approve the agenda as presented. The motion was seconded by Kirby Anderson and carried unanimously.
Reports were presented by:
Mike Donoho: KSS/Roosevelt Paging System
General Consent Items
The following consent agenda was presented for approval:
Personnel
Support Staff Resignations:
-Scott Meldahl, special education paraprofessional; effective 7/18/2023
-Heather Johnston, student support aide; effective 7/18/2023
-Amanda Duenow, special education paraprofessional; effective 7/20/2023
-Candice Gholson, special education paraprofessional; effective 9/1/2023
Support Staff Hires:
-Heather Johnston, special education paraprofessional @ Adams; effective 8/30/2023
-Levi Schiller, custodian (1 FTE) @ KSS; effective 8/15/2023
-Cheryl Petersen, custodian (.5 FTE) @ KSS; effective 9/5/2023
Certified Staff Resignation:
-Kassy Arntson, middle school art teacher @ KSS; effective 7/24/2023
Certified Staff Hires:
Angela Nord, special education teacher @ KSS; effective 8/28/2023
Scott Meldahl, FCS teacher @ KSS; effective 8/28/2023
Payton Skonseng, language arts teacher @ KSS - contract increase of .0833 FTE (1 FTE total); effective 8/28/2023
Missy Hermes moved to approve the consent agenda. The motion was seconded by Stephen Vigesaa and carried unanimously.
Preston Euerle, RA Morton & Associates, presented information on the Lincoln Phase II bidding packages.
New Business:
Matthew Lemke moved to approve Alternate Bid Packages (listed below) for the Lincoln Phase II; contingent upon a successful pre-award interview of the contractor to confirm the bid amount and construction schedule:
- Alternate #1B: Re-roof existing deck with the new EPDM membrane, re-use existing insulation, assume R-10 and add insulation to meet code compliance, new parapet cap and associated details
- Alternate #2A: Add new ACT ceiling in existing hallways
- Alternate #2B: Extend existing hallway walls to deck
- Alternate #3: New access road connecting Pioneer Road to the revised building loop road.
- Alternate #4: New sound attenuation panels and baffles in existing Pre-K Cafeteira (RM 174)
The motion was seconded by Kirby Anderson and carried unanimously.
Melanie Cole moved to approve the Construction Base Bid Package of $11,264,855 for Lincoln Phase II project; contingent upon a successful pre-award interview of the contractor to confirm the bid amount and construction schedule. The motion was seconded by Kirby Anderson and carried unanimously.
Matthew Lemke moved to approve the quote from TechCheck in the amount of $66,830 for KSS/Roosevelt Paging System. The motion was seconded by Missy Hermes and carried unanimously.
Matthew Lemke moved to approve revisions to the 2023-2024 iQ Academy Calendar. The motion was seconded by Melanie Cole and carried unanimously.
The next regular School Board meeting will be held at 7:15 am Monday, August 14, 2023 in the Otter Community Room at the Kennedy Secondary School.